In our approximately 3000 m2 workshop at the production site in Großenlüder, we manufacture timber elements and room modules. This results in school buildings, hotels, residential and office buildings as well as retail spaces, all planned in accordance with standardised building concepts. In spring 2027, all production and assembly facilities, which are also located here, will be relocated to Steinau an der Straße.

Working in Großenlüder – what you can expect:

  • Good transport connections: 20 minutes by car to Fulda
  • Grossenlüder railway station with train connections to Fulda and Lauterbach within walking distance
  • Modern workstations, high-quality work equipment
  • Free fresh fruit and mineral water
  • Team events such as monthly after-work drinks, hiking days and a Christmas party
  • Twice a year, effective and transparent employee information from the Executive Board
  • We Are Blumer Lehmann Day: the annual meeting of employees from all sites at the headquarters, with training sessions and a summer party

Location Grossenlüder
Production Timber and modular construction

Blumer-Lehmann GmbH Holzbau | Engineering
Industriestraße 4 | 36137 Großenlüder
Google Maps
Routenplaner

T +49 160 3623069
info@blumer-lehmann.com

Ihre Ansprechpartner in Großenlüder

Andreas Schrauth Head of Human Resources Germany, Austria and Luxembourg
Andreas Schrauth

Personnel Officer DE | AT | LU

T +49 2225 9113 027
andreas.schrauth@blumer-lehmann.com