Ein modulares Bürogebäude für das CERN

Due to the optimised construction time on site and the sustainable, renewable material wood, the decision was made to opt for a modular timber construction. CERN considers building 3195 to be a pilot project for its office buildings in terms of timber and modular construction.

Both floors of the two-storey building house meeting rooms, workshops, offices and open spaces as well as toilets, a technical room and a cleaning room. On the upper floor there is also a common room, the management office and a printing room. Dark linoleum was used for the flooring, while the walls are painted white. The ceilings were clad with Heradesign acoustic panels for good noise absorption.

The modular office building complies with the Geneva THPE standard and is connected to the CERN district heating system. The closed, vertical facade consists of rough-cut and pre-greyed slats with tongue and groove.

Portrait Yannick Neumann Sales Modular Construction Western Switzerland Blumer Lehmann

Yannick Neumann

Sales | Timber and Modular Construction | Western Switzerland
Sales | Silo and Facilities Construction | Western Switzerland & France

+41 71 388 52 75
yannick.neumann@blumer-lehmann.com
Modern office corridor in modular construction with open staircase

Light, modern interior of a modular construction office with a centrally placed steel staircase, clear room layout and adjacent office spaces.

Modern staircase in a modular office

Minimalist staircase in a modern modular building with clear lines, metal railing and direct access to the office spaces.